Friends of Stellenbosch Mountain
Home
Hacks
Blog
Documents
Nature Area
Interim airphoto collection (11 November)
Index: Spier documents 2020-2025
Basic parameters
2025-2026 Section 24G Application
October 2025: DEADP Authorisation and FSM Appeal
2024-2025 Second Development Application ("Solar Panels")
2019-2020 First Development Application ("Vineyard")
Basic parameters
- Location: Eastern Part of Portion 10 of Farm 502, just west of the Stellenbosch Airfields. The "Vineyard" application and authorisation
is in the southern part of this eastern part
- Owner: Spier. Area long considered one of the last large pieces of CBA in private hands in the Stellenbosch area.
- EAP Groenberg Enviro Email mische@groenbergenviro.co.za
2025-2026 Section 24G Application
Draft Final Basic Assessment (FBAR) (January 2025)
-
The Public Notice sets out that comments may be sent to the EAP until 16 February 2026.
- The Draft FBAR is essentially the Final BAR; all that must still be inserted is the comments solicited in the Public Notice.
-
The large majority of the files to be found on the EAP website (see Public Notice) are essentially identical with the original DBAR ones which appear
below in the DBAR section.
-
Annexure G: collection of public comments
is of course new. Ignore all the fluff and start reading at Appendix G6.
-
The Response Table is what really matters (Appendix G7). In this
long table, the EAP replies to comments point by point and tries to discredit comments, obfuscate, repeat claims etc.
Selected comments on the DBAR
Draft Basic Assessment Report (DBAR) (October 2025)
These three are the most important documents; see further down for full list of all Section 24G DBAR documents.
October 2025: DEADP Authorisation and FSM Appeal
2024-2025 Second Development Application ("Solar Panels")
- November 2024 DBAR
- May 2025 DBAR Version 2 TODO
- July 2025 Final BAR 2 TODO
2019-2020 First Development Application ("Vineyard")
|